Hall Farm Wind Farm

JB Brand
March 20, 2014
Client:
Ridgewind Ltd
Contract Value:
£5m
Contract Date:
2012 - 2013
Location:
near Hull

Balance of plant civils and electrical infrastructure for 12 Repower 2.05MW turbines.

The site is located approximately 5.5km north of Beverley, near Hull.

Major activities included:

  • Design and construction of 6.5km of site access tracks
  • Construction of 12 concrete turbine bases, each on 350mm square driven piles
  • Construction of 12 crane pads measuring 45m x 30m
  • Construction of substation and control building
  • 7km of on-site cable trenching/laying
  • 4.5km of off-site cable trenching along s public highway to the point of connection
  • Design and construction of 16m span steel bridge with timber decking to cross Holderness drain
  • Electrical infrastructure installation by specialist partner
  • Landscaping and reinstatement work

Also in this section

JB Brand
Jones Bros
Jones Bros is one of the UK’s leading civil engineering contractors with a wealth of experience across a broad range of sectors.
© 2026 Jones Bros. All rights reserved.
There are many variations of passages of Lorem Ipsum available, but the majority have suffered alteration in some form.

Let’s Work Together