Cheshire Green Employment Park

JB Brand
September 5, 2024
Contract Value:
£828k
Contract Date:
June 2017 - December 2017
Location:
Cheshire, England

Split into two phases, which were classified as the Industrial Estate (phase one) and the Employment Park (phase two), activity focused on the construction of a roundabout and spine road.

Works included:

  • 50,000m3 of cut to stockpile, with no material being removed from site
  • New infrastructure connections which required close management
  • Primary substation and compound for Scottish Power
  • 2km of surface water and foul drainage, including two pumping stations and tubosider attenuation
  • 1km of access road
  • 3km rising main

Also in this section

JB Brand
Jones Bros
Jones Bros is one of the UK’s leading civil engineering contractors with a wealth of experience across a broad range of sectors.
© 2026 Jones Bros. All rights reserved.
There are many variations of passages of Lorem Ipsum available, but the majority have suffered alteration in some form.

Let’s Work Together