Sixpenny Wood Wind Farm

JB Brand
March 20, 2014
Client:
Sixpenny Wood Windfarm Ltd
Contract Value:
£3.6m
Contract Date:
2012 - 2013
Location:
Yorkshire

Balance of plant civils and electrical infrastructure for 10 Repower 2.0MW turbines.

Major activities included:

  • Design and construction of 7km of site access tracks
  • Construction of concrete turbine and crane pad foundations using locally sourced steel and concrete (all turbine bases pile driven)
  • Construction of substation building using local labour
  • 5.5km of on-site cable trenching and cable laying
  • Construction of new Section 278 approved site entrance off public highway
  • Construction of a new steel and timber deck bridge to enable crossing of near drain
  • Design and construction of on-site drainage to comply with drainage board and landowner requirements
  • Electrical installation by specialist subcontractor
  • Landscaping and reinstatement of all site tracks and crane pads

Also in this section

JB Brand
Jones Bros
Jones Bros is one of the UK’s leading civil engineering contractors with a wealth of experience across a broad range of sectors.
© 2026 Jones Bros. All rights reserved.
There are many variations of passages of Lorem Ipsum available, but the majority have suffered alteration in some form.

Let’s Work Together