Jones Bros was appointed as the principal contractor for the scheme in East Ayrshire, Scotland, which will have the capacity to power more than 160,000 households. Works included: Constructing 49…
A design and build of the onshore infrastructure for the tidal energy project in Holyhead, Anglesey. Works included: Landfall substation design and build containing nine bays, ancillary buildings, and transformer…
The project consisted of two phases of the world’s largest offshore wind farm, each with an installed capacity of up to 1.2 gigawatts. Covering 515km2, Dogger Bank A is approximately…
The Balfour Beatty Jones Bros Joint Venture designed and constructed a 9.8km highway. It forms a western bypass to Llanwnda, Dinas, and Bontnewydd before crossing the existing A487 to pass…
A design and build project of a new dual carriageway with a series of structures that links the existing A49 Warrington roundabout to the B5238 Poolstock Lane / Westwood Road…
Split into two phases, which were classified as the Industrial Estate (phase one) and the Employment Park (phase two), activity focused on the construction of a roundabout and spine road.…
Running for four years to 2021, Jones Bros successfully undertook £43m of work for the waste management company, delivered in-house by one of the largest plant fleets in the UK.…
Activity at the landfill site in Markham Vale, Chesterfield, was split into three areas: Leachate reception area Permanent capping Cell 4a, 4b, and asbestos cell extension. Works included: Constructing a…
Delivering multi-million-pound shoreside improvements as part of a coastal defence scheme. Works included: Procurement and road delivery of 70,000 tonnes of rock armour Earthworks Installation of rock armour, geotextile, new…
Part of the planned, unplanned, and cyclical maintenance contract work at Holyhead Port, a major ferry hub on Anglesey. Works included: 21,000m2 of new surfacing 20,000 tonnes of imported rock…