Holyhead Port Capital Works and Maintenance Contract

Client:
Stena Line Ltd
Location:
Holyhead, Wales

Part of the planned, unplanned, and cyclical maintenance contract work at Holyhead Port, a major ferry hub on Anglesey.

Works included:

  • 21,000m2 of new surfacing
  • 20,000 tonnes of imported rock armour to create a new revetment
  • 19 new vehicle running lanes
  • Improved vehicle, pedestrian, and trailer storage segregation

In addition, 42 per cent of the total spend of the project was spent locally on materials and local sub-contractors, while all surplus materials were recycled and reused within the port.

Also in this section

Jones Bros is one of the UK’s leading civil engineering contractors with a wealth of experience across a broad range of sectors.
© 2026 Jones Bros. All rights reserved.
There are many variations of passages of Lorem Ipsum available, but the majority have suffered alteration in some form.

Let’s Work Together