North Kyle Wind Farm
Jones Bros was appointed as the principal contractor for the scheme in East Ayrshire, Scotland, which will have the capacity…
The project consisted of two phases of the world’s largest offshore wind farm, each with an installed capacity of up to 1.2 gigawatts.
Covering 515km2, Dogger Bank A is approximately 131km from shore at its closest point, as is Dogger Bank B, which covers 599km2.
Jones Bros was engaged to commence with preliminary design work for a fully ducted system for the installation of both high voltage DC (HVDC) and AC (HVAC) cables. This was in conjunction with further design activity.
Works included:
In addition to the offshore works, there were a number of other major activities undertaken to connect the renewable energy to the National Grid including: