Dunbar Landfill

Client:
Viridor Waste Management Ltd
Contract Value:
£35.5K
Contract Date:
June 2011
Location:
Dunbar

The project was primarily to enable existing gas wells to continue extracting gas, whilst having the ability to incorporate pneumatic pumps to assist with leachate control.

Works included:

  • Installation of a temporary manifold, surface laid 90mm lateral gas connections and associated connections to four recently drilled gas wells in the current live tipping area of the landfill
  • Installation of 125mm gas extraction main with associated control valves and chambers
  • Supply and installation of pumped well heads to five wells in the restored area of the landfill, with associated buried air and condensate connections
  • Supply and installation of pumped well heads to two existing small diameter wells within the restored area, with associated buried air and condensate connections
  • Installation of air and condensate discharge lines to facilitate the future fitting of pneumatic pumps in the small diameter wells

Work was completed in July 2011, on schedule.

Also in this section

Jones Bros is one of the UK’s leading civil engineering contractors with a wealth of experience across a broad range of sectors.
© 2026 Jones Bros. All rights reserved.
There are many variations of passages of Lorem Ipsum available, but the majority have suffered alteration in some form.

Let’s Work Together