Glass Moor 2 windfarm

JB Brand
March 20, 2014
Client:
EDF Energy Renewables
Contract Value:
£1.9m
Contract Date:
2012 - 2013
Location:
near Peterborough

Balance of plant civils and electrical infrastructure for six Repower 2MW turbines.

Major activities included:

  • Design and construction of site tracks including swept path analysis
  • Construction of wind turbine foundations and crane pad hard standings
  • Construction of substation building
  • High pressure gas main crossings
  • Culverts on IDB controlled water courses
  • 2km extension of telecoms cable
  • Installation of HV cable from turbines to substation
  • External transformer foundations.
  • Landscaping and reinstatement of all site tracks

Also in this section

JB Brand
Jones Bros
Jones Bros is one of the UK’s leading civil engineering contractors with a wealth of experience across a broad range of sectors.
© 2026 Jones Bros. All rights reserved.
There are many variations of passages of Lorem Ipsum available, but the majority have suffered alteration in some form.

Let’s Work Together