Middlewick Windfarm Infrastructure, Essex

JB Brand
November 22, 2016
Client:
Blue Energy
Contract Value:
£5.4m
Contract Date:
2014
Location:
Essex

Balance of plant civils and electrical infrastructure for 9 Siemens 2.3MW turbines.

Works included:

  • Design and construction of site access tracks and crane hard standings using locally sourced materials (cement stabilised)
  • Construction of marine unloading platform
  • Improvements to the public highway
  • Construction of piled reinforced concrete turbine foundations
  • Construction of control building
  • 6km of HV cable installation
  • Electrical design and installation
  • Supervision of delivery and erection of turbines
  • Landscaping and reinstatement

Also in this section

JB Brand
Jones Bros
Jones Bros is one of the UK’s leading civil engineering contractors with a wealth of experience across a broad range of sectors.
© 2026 Jones Bros. All rights reserved.
There are many variations of passages of Lorem Ipsum available, but the majority have suffered alteration in some form.

Let’s Work Together