Balance of Plant civil engineering works for 9 Enercon E53 0.8MW wind turbines.

Works Included

  • Demolition of railway bridge abutments on public highway to improve site entrance visibility.
  • Design and construction of site access tracks and crane platforms.
  • Construction of reinforced concrete turbine foundations.
  • Construction of control building.
  • Installation of HV and communications cables
  • Supervision of delivery and erection of turbines
  • Landscaping and reinstatement

Also in this section

JB Brand
Jones Bros
Jones Bros is one of the UK’s leading civil engineering contractors with a wealth of experience across a broad range of sectors.
© 2026 Jones Bros. All rights reserved.
There are many variations of passages of Lorem Ipsum available, but the majority have suffered alteration in some form.

Let’s Work Together