The Balfour Beatty Jones Bros Joint Venture designed and constructed a 9.8km highway. It forms a western bypass to Llanwnda, Dinas, and Bontnewydd before crossing the existing A487 to pass…
A design and build project of a new dual carriageway with a series of structures that links the existing A49 Warrington roundabout to the B5238 Poolstock Lane / Westwood Road…
Split into two phases, which were classified as the Industrial Estate (phase one) and the Employment Park (phase two), activity focused on the construction of a roundabout and spine road.…
The 50:50 joint venture between Jones Bros and Balfour Beatty saw the construction of a 5.2km carriageway. The project was constructed through SSSIs and AONB, predominantly on green field land…