Client:
Welsh Government
Contract Value:
£4.5m
Contract Date:
2006 – 2007
Location:
A5 Ty Nant

Failure of several rock anchors on the north face of the rock cutting was discovered during routine inspection. For safety reasons the road was closed and traffic was diverted.

Cutting the north face back to a calculated stable angle, with some re-anchoring to the south face, was proposed.

The blasting work was carried out successfully, with 225,000 tonnes of rock and soil being removed from site.

The rock was utilised as recycled aggregate, while the soil helped restore part of the nearby Moel Y Faen quarry.

Once the rock had been removed, the existing carriageway was reconstructed.

It was reopened to the public on schedule.

Also in this section

Jones Bros is one of the UK’s leading civil engineering contractors with a wealth of experience across a broad range of sectors.
© 2026 Jones Bros. All rights reserved.
There are many variations of passages of Lorem Ipsum available, but the majority have suffered alteration in some form.

Let’s Work Together