Compton Bassett Landfill

Client:
Hills Waste Solutions Ltd
Contract Value:
£930k
Contract Date:
April 2011
Location:
Compton Bassett

Cell construction works included:

  • 300,000m3 of bulk earthworks, de-watering of sands and gravels
  • Under cell drainage for progression of earthworks
  • 15,000m3 of sand excavation for quarrying operations
  • 25,000m2 engineered clay capping to cell
  • Installation of 12,000m2 geocomposite drainage layer to side-slopes
  • 25,000m3 of engineered clay liner to cell base
  • 300m fully welded HDPE leachate pipework
  • 17,500m2 of baled tyres placed to form the leachate drainage blanket
  • Upper sidewall extension to cell

The cell was completed three weeks ahead of programme.

Also in this section

Jones Bros is one of the UK’s leading civil engineering contractors with a wealth of experience across a broad range of sectors.
© 2026 Jones Bros. All rights reserved.
There are many variations of passages of Lorem Ipsum available, but the majority have suffered alteration in some form.

Let’s Work Together