St Breock Wind Farm

JB Brand
November 22, 2016
Client:
REG Wind
Contract Value:
£1.9m
Contract Date:
2014/15
Location:
Cornwall

Balance of plant civils and electrical infrastructure for 5 Vestas 2.0MW turbines.

Work included:

Decommissioning of eleven existing turbines that formed one of the UK’s first commercial wind farms over 20 years ago, and replacing them with five higher specification new turbines.

This required the construction of associated reinforced concrete bases, crane pads and duct installations for each new turbine and the construction of stone access tracks to allow access for turbine delivery, erection and future maintenance.

These construction activities were carried out in a very sensitive environment, requiring Jones Bros to work closely on a daily basis with the client’s environmental consultant, to ensure bat roosts, areas of SSSI and protected hedge rows were unaffected by the works.

Also in this section

JB Brand
Jones Bros
Jones Bros is one of the UK’s leading civil engineering contractors with a wealth of experience across a broad range of sectors.
© 2026 Jones Bros. All rights reserved.
There are many variations of passages of Lorem Ipsum available, but the majority have suffered alteration in some form.

Let’s Work Together