Work on the seven-turbine windfarm, in an environmentally sensitive area included:
Working alongside its design team of Mott MacDonald and Powersystems, Jones Bros successfully completed the construction of seven turbine bases, of which one was a piled foundation design for added support to the foundation loads.
The substation work also included design and build of substation building, as well as preparation of the area for the installation of transformers and several pieces of grid compliance equipment.