17 July 2013

High Haswell Windfarm Infrastructure

High Haswell Windfarm Infrastructure

Design and build balance of plant civils and electrical infrastructure for two Vestas 2.0MW turbines. The site is located on existing farmland in the North East of England, near the…
Read more
Millour Hill Windfarm Infrastructure

Millour Hill Windfarm Infrastructure

Design and build balance of plant contract for the civils and electrical infrastructure for six Siemens 3.0MW turbines. The site is located in North Ayrshire, on the west coast of…
Read more
Darracott Windfarm Infrastructure

Darracott Windfarm Infrastructure

Design and construct balance of plant civils and electrical infrastructure for three Gamesa 850KW turbines. The site is located in farmland near the town of Torrington, Devon, and is situated…
Read more
Tullo windfarm Infrastructure

Tullo windfarm Infrastructure

Work on the seven-turbine windfarm, in an environmentally sensitive area included: Design and construction of access tracks Design and construction of concrete turbine bases and crane pads Design and construction…
Read more
Cefn Croes Windfarm Infrastructure

Cefn Croes Windfarm Infrastructure

Upon completion, Cefn Croes was the largest windfarm in the UK with 39 1.5MW turbines. As balance of plant contractor, Jones Bros constructed access roads, turbine bases, the crane bases…
Read more
Carno Windfarm Infrastructure

Carno Windfarm Infrastructure

The project involved the design and construction of 12 turbine bases and 4km of access roads. Structural design of the bases was carried out by Mott MacDonald, with Powersystems responsible…
Read more
Tywyn Coastal Defence Scheme

Tywyn Coastal Defence Scheme

Work to restore Tywyn’s depleted sea defences involved approx 60,000 tonnes of armour stone being delivered by sea and road, following the removal of existing timber groynes. The scheme comprised:…
Read more
Terminal 3 Development

Terminal 3 Development

The scheme involved the construction of an offshore rock breakwater containing more than 150,000 tonnes of locally produced rock core and armour, plus the infilling of 240,000m3 of dredged sand.…
Read more
Deganwy Marina Construction

Deganwy Marina Construction

A boating marina was built adjacent to an existing quay, as part of a prestige housing and hotel complex. The work involved: Construction of a rock breakwater projecting 170m into…
Read more
A55 Llanddulas

A55 Llanddulas

Work was carried out on the A55 trunk road between Llanddulas and Pensarn – the only remaining section of the A55 that failed to meet carriageway standards. The scheme increased…
Read more
Jones Bros is one of the UK’s leading civil engineering contractors with a wealth of experience across a broad range of sectors.
© 2026 Jones Bros. All rights reserved.
There are many variations of passages of Lorem Ipsum available, but the majority have suffered alteration in some form.

Let’s Work Together