Erin Landfill Site

Client:
Viridor
Contract Value:
£2.3m
Contract Date:
2019
Location:
Markham Vale, Chesterfield

Activity at the landfill site in Markham Vale, Chesterfield, was split into three areas:

  • Leachate reception area
  • Permanent capping
  • Cell 4a, 4b, and asbestos cell extension.

Works included:

  • Constructing a fully contained concrete leachate reception area, including a completely automated leachate extraction system
  • Permanent capping activity that featured 21,000m2 of fully welded LLDPE and protector geotextiles and two layers of restoration soils
  • Removing 108,000m3 of soil
  • Installation of a ground water extraction system with 700m fully welded HDPE pipework into chamber and pumping system
  • Installation of 35,000m3 of engineered barrier and 35,000m2 of fully welded HDPE and protector geotextile
  • Installation of full leachate extraction system featuring bespoke chambers with 800m of HDPE pipework and filter geotextile
  • Installation of internal haul road and turnaround pad
  • Geophysical detection on all cells

Also in this section

Jones Bros is one of the UK’s leading civil engineering contractors with a wealth of experience across a broad range of sectors.
© 2026 Jones Bros. All rights reserved.
There are many variations of passages of Lorem Ipsum available, but the majority have suffered alteration in some form.

Let’s Work Together